Transport
Bristol Airport
Recently completed fit out project, in collaboration with QDL and Lancer Scott at Airside Departures at Bristol Airport.
The total program lasted over 3 months which included new ceiling grids , electrical and decorating works within a live environment.
Our contribution included working with levels within an existing floor substrate and producing a suitable installation surface for the flooring finishes of Amtico , IVC and Karndean products.
Working all sorts of hours the areas were handed over last week to the public where I do need to pay a visit on my next trip away.
Work continues for us switching back to the Air Traffic Control tower refurbishment which is nearing completion.
Thanks goes to Sam Davies of QDL and our team lead by Ieaun and Carwyn for all their efforts.
Main Contractor
QDL
DaTE
LOCATION